[technology sharing] construction technology | 34 kinds of latest construction technology practices

Release time:

2024-06-06 16:36

Construction refers to the construction of the implementation phase of the production activities, is the construction process of all kinds of buildings, and "construction site", in the construction process of the use of technology and practices have been in the exploration and update, this paper summarizes the construction of new technology and new practices, for the reference of partners.

Construction of 1. masonry wall without frame eye
  Process practicesFirst, weld a T-shaped flat iron at the end of the steel pipe cross bar of the scaffold. The masonry height shall reach the erection point. The erection point shall be selected at the intersection of vertical mortar seam and horizontal seam. When scaffolding is supported, the T-shaped flat iron at the end of the crossbar can be supported on the wall, and mortar can not be placed at the place where the flat iron is placed, so as to facilitate disassembly and assembly.

 

New Technology of Formwork Eyelet Support Without Frame for 2. Structural Column and Ring Beam
Process I:
The Φ14 pair bolt (through Φ15PVC plastic pipe) embedded in the "GZ" formwork section is used to fix the formwork instead of the frame eye retained in the masonry, thus improving the overall masonry effect of the wall surface. Specific construction process operation: "GZ" formwork adopts 12mm thick plywood on the whole surface, which is integrated with 3 pieces of 50mm × 80mm usually stare blankly, I .e. "GZ" uses one shaped formwork on each side. When supporting the mold, the pull bolt is embedded in the "GZ" section, and each layer on the outer side of the end is locked with 4 groups of 50mm × 80mm short wood square, and the inner female angle part is usually supported with 100mm × 100mm wood square. This method shall be used for the "one" shape, L-shaped corner and T-shaped corner of brick-concrete structure.

Process II:

(1) The combined shaped steel formwork shall be adopted, and the formwork shall be locked with short steel pipes and special through-wall bolts. One end of the special through-wall bolts shall be welded with Φ12 steel bar with steel pipe sleeve or straight stop head, and the other end shall be threaded.
(2) When building walls, plastic pipes shall be embedded at the frame holes retained according to the specifications. After building, the plastic pipes shall be drawn out to form reserved holes.
(3) During formwork support, insert Φ12 special bolts into the reserved holes, and tighten the thread sleeve end with nuts.

Process three:

Ring beam hard frame formwork process practices:
(1) During wall masonry, Φ16PVC plastic pipe shall be buried at the brick under the ring beam. After masonry, the pipe shall be gently rotated and drawn out to form Φ16 installation holes with a spacing of 800~1000mm.

(2) Install special tools made of √ 40 × 4 angle steel, and fix them with Φ14 bolts in the installation hole.

(3) Install the ordinary composite steel formwork, tighten the bolts and adjust the straightness of the formwork.

constructional column formwork process practices:
(1) During masonry construction, Φ16mm installation holes shall be reserved with Φ16PVC plastic pipes at 240mm from the constructional column on the horizontal mortar joint, and the vertical spacing shall not be more than 800mm.
(2) After acceptance of structural column reinforcement, install combined formwork.
(3) Install special die made of √ 50 × 5 angle steel and fasten it with Φ14 through-wall bolts.
Process four:
According to the thickness of the wall, take out the PVC pipe of corresponding length, and set rubber plug heads at both ends, so that the size of the outer edge of the two plug heads is exactly the cross-sectional size of the concrete member. When the formwork is erected, put on the pull bolt rod to fix the formwork. After the concrete pouring is completed, take out the rubber plug head and fill the hole with 1:2 cement mortar to smooth it. Another method is to prefabricate a 5mm thick flat iron. One end of the flat iron is made into a hook with a length of 5cm and a length of 90 degrees. When the wall is erected or scaffolding is erected, the flat iron is inserted into the brick seam embedded in the wall, which also has the same use effect as the wall.
Advantages:
1, no eye mold process requires less shaping mold, mold turnover rate is high, cost saving, template installation and disassembly is convenient.
2. No eyes are left on the masonry, which improves the overall strength of the wall.
3. The concrete surface is flat, smooth and consistent in color, which effectively eliminates the common quality problems of concrete flow and pollution of the wall.
4. The process of regular eye construction is omitted, labor cost is reduced, and conditions are created for shortening the construction period.









 

Application of 3. Frame Beam, Column, Plate Node Stereotype Template
Method 1: Combined small steel formwork and special-shaped angle formwork are used at the joints of beams, columns and plates, and sponge strips are placed at the joints of the formwork. The special-shaped corner template is customized according to the actual situation.
Method two: take bamboo plywood custom stereotypes template.

 

4. toilet concrete flanging and floor cast-in-place concrete overall construction method
In order to improve the waterproof performance of the toilet and bath room, the concrete flanging requires the integral pouring of hanging formwork and floor concrete.

 

Application Technology of 5. Sponge Strip in Formwork Engineering
  Process practicesIn the construction of formwork, before the formwork of the constructional column and ring beam of brick-concrete structure is installed, soft foam sponge strips or hard sponge strips with double-sided adhesive tape shall be pasted on both sides of the constructional column and the wall surface under the ring beam.
Advantages: It can effectively prevent the wall surface pollution caused by the overflow of concrete cement slurry.

 

Brick masonry on top of 6. infill wall
Process practices: Cut the roof brick used for masonry in advance, so that the upper and lower contact surfaces of the inclined roof brick are flat, and the angle is 60 degrees with the horizontal plane when laid obliquely.
Advantages: The upper and lower surfaces are flat, which ensures that the thickness of the masonry horizontal mortar joint is about 10mm, and avoids the common quality problem of excessive mortar joint thickness. The top brick forms an angle of 60 degrees with the horizontal plane, which makes the masonry more dense and makes the masonry better integrated. The common quality defect of through-seam in the contact part between the infilled wall and the frame beam after plastering is avoided. The construction is convenient, the masonry is neat, and the appearance quality is good.

 

Special shaped bricks in 7. masonry shall be cut or prefabricated
Process practices: The seven-part head used in the wall is generally prefabricated from the brick yard or cut with a toothless saw at the construction site. The lowest skin brick of the protruding part of the horse tooth Cha brick is also cut into a 45-degree inclined plane with a toothless saw.
  Advantages: The lowest skin brick of the protruding part of Ma Ya Cha is cut into a 45-degree inclined plane to facilitate concrete pouring and compactness, thus improving the perception quality of the wall.

 

Application Technology of Skin Count Rod in 8. Masonry Construction
Process practices: The leather counting rod is made of 3cm × 5cm wood square planing. There is an adjustable base under the leather counting rod. The leather counting rod shall be clearly marked with mortar joint, pressing rib position, wall structure change, etc. and shall be fixed and stable.

 

Construction Practice of Precast Concrete Block for Wood Brick of 9. Doors and Windows
The traditional fixing method of door and window frame is to embed wooden bricks in the wall. Since the wall is mostly made of porous bricks and the wooden bricks are not firmly fixed, it is now changed to precast concrete blocks with the same cross-sectional size as the blocks. During wall masonry, the precast concrete blocks are built into the original position of wooden bricks and the door and window frame can be fixed on precast concrete.

 

Fixing Method of Reinforcement Position of 10. Structural Column
A steel bar well-shaped fixing frame is set at the top of the constructional column. The well-shaped frame fixes the reinforcement of the constructional column together with the stirrups on the inner side of the steel bar skeleton to ensure the spacing of the main reinforcement of the constructional column. The tool-type well-shaped frame can be used in turnover, which can effectively prevent the displacement of the reinforcement in the process of concrete pouring and vibrating. The reinforced tic-tac-toe frame is made according to the size of the constructional column. Φ8 or Φ10 steel bars shall be spot welded with electric welding machine to form a t-hole bracket. Both sides of the tic-tac-toe frame are close to the brick wall, and the other sides are close to the formwork. Ensure that the size is accurate before installation. After placing the tic-tac-toe frame, it shall be tied together with the stirrup to the reinforcement of the constructional column, and finally the formwork shall be installed.

 

XI. Anti-pollution practices for reinforcement works
Before pouring concrete, the PVC plastic pipe is sleeved on the column steel bar (the root of the pipe is the concrete pouring elevation), which can effectively prevent the cement paste from exposing the column steel bar and facilitate the concrete construction.

 

XII. Construction practices of stair slab construction joint retention
 Construction practicesWhen supporting formwork for stairs, according to the construction specifications, the stair step construction joint shall be retained within the span 1/3 of cast-in-situ floor slab. The stair step construction joint shall be slotted at the lower part of the horizontal blocking formwork according to the spacing and specifications of the steel bars, so as to keep the steel bars free from displacement and perpendicular to the bottom formwork. A steel bar or plastic cushion block with the same thickness as the protective layer shall be padded under the main reinforcement of the bottom plate to ensure the protective layer to ensure the thickness.

 

XIII. Curing technology of cast-in-place column concrete
Process practicesAfter the concrete is poured, timely and effective curing measures shall be taken according to the construction technical scheme. The concrete shall be covered and moisturized within 12 hours. For the concrete cured by watering, the watering frequency shall be able to keep the concrete in a wet state. The curing water shall be the same as the mixing water. The concrete cured by plastic cloth shall be covered with plastic cloth, and the exposed part shall be tightly covered and condensed water shall be kept in the plastic cloth. When the concrete surface is inconvenient to water or use plastic cloth, it is advisable to apply curing agent.

 

Fourteen, stair step positive angle protection technology
Process practicesThe height and width of the stair step shall be constructed in strict accordance with the design requirements. The positive angle of the stair step is set with long finished copper or plastic angle strips, angle steel and steel bars with a diameter of 6mm. When plastering, the corner protector is embedded in the surface layer to make the corner protector and the outer surface of the surface layer flat and consistent. The outer end of the stair step is set with inlaid tiles to block the water edge, and the drip tank is set below.

 

Fifteen, floor drain floor tile set cutting all sides to find slope to serve practice
Process practices: When sloping and pasting floor tiles on the floor of toilet and kitchen buildings, slope shall be found on all sides around the floor drain according to the design requirements. Divide the floor tiles at the round floor drain or square floor drain into four parts, cut diagonally, and pave on the slope. The traditional practice of floor tiles at the floor drain is that the edges and corners of the whole brick protrude or sag, which affects the visual effect and drainage quality. After the improvement of the original construction method, the drainage quality is improved, the phenomenon of falling slope is prevented, and the effect of perception is increased.

 

Sixteen, skirting board upper inlaid plastic strip construction practices

 


Process practices:
(1) After the leveling layer is completed, clean the wall surface and sprinkle water to wet it.
(2) wall paste cake, spring line.
(3) hanging line with 1:2 cement mortar or plastering gypsum powder inlaid with plastic strip.
(4) wipe kick corner line.
(5) Follow-up construction.
Advantages: The inner kicking corner line adopts new lines, with clear color separation, reducing mutual pollution and avoiding the trouble caused by the late decoration of the residential project where the dark kicking corner line hair wall surface is handed over.






 

Seventeen, to prevent the floor brick uplift construction practices
Before paving the floor tiles, paste 8~10mm thick benzene board along the wall to form an elastic contact surface between the wall and the floor. The ground tile jointing material adopts cement fly ash jointing, the joint width is 3~5mm, and the ratio is 1:2.

 

Eighteen, indoor wall brick paste grass-roots pulling construction practices
Special plastering tools are used for tile pasting at the base, and 3mm wide flat grooves are introduced or other effective roughening measures are taken. Make the bonding layer stick firmly, prevent tile hollowing, the effect is remarkable.

 

19. Anti-leakage practices for the root of water supply and drainage pipes
Process practices: Before the leveling layer is made on the floor of the kitchen and bathroom building, a fine stone concrete arc slope is made at the root of the pipeline. Waterproof construction to do waterproof additional layer, waterproof layer to do the ground surface layer below 20mm. Plastic casing shall be made at the bottom of PVC pipe, with a net height of 20mm and an inner diameter of 25~40mm larger than the outer diameter of drain pipe. It shall be filled with water sand mortar, leveled and painted at the top.
Advantages: The waterproof layer directly achieves the position of the water blocking table, which prevents the common leakage of the canal root and the canal root is beautiful and clean.

 

Twenty, the upper and lower water level riser reserved holes, hole blocking new technology
Process practices:

(1) Make a simple hole-blocking mold with iron plate.
(2) Install the mold with the riser as the support.
(3) Pouring hole concrete.
(4) Remove the mold, clean it, brush oil and store it.
Advantages: The mold is simple to make, quick to install, stable, easy to dismantle, can be used around, can eliminate the hole expansion mold and tube root unequal quality problems.




 

Twenty-one, rear plug wooden door frame fixing method
Construction practices:
(1) Doorway plastering requires that the length and width dimensions must be accurate. According to the size of the door and window openings after plastering, 1.5~2mm gaps are reserved on each side to determine the size of wooden door frame.
(2) temporarily fix the wooden door frame after vertical leveling, and then use an impact drill to vertically punch Φ6 round holes along the length of the wooden door frame. The depth of the round holes into the wall shall not be less than 70mm, and the number of fixing points shall be in accordance with the specification requirements.
(3) Cut Φ6.5 steel bar into 105mm long, cut one end obliquely, hammer into the wall, and embed the other end into the wooden frame surface for 1~2mm.
(4) After the joints between the wooden frame and the wall are filled with elastic materials, they are closed with dense seam glue.
Advantages:
(1) The wood of the reserved wooden bricks is saved and the installation firmness of the wooden door frame is improved.
(2) Ensure the flatness of the plastering on both sides of the wooden door frame.
(3) to avoid the first wooden door frame due to plaster caused by pollution and damage, is conducive to the protection of finished products.








 

Construction practices to prevent wall cracks
In order to prevent or reduce the common quality defect of wall cracking, 60mm thick horizontal and vertical cast-in-situ reinforced concrete strips or press bars under the window sill are set at the height of the first floor and the top window sill of the masonry, which can effectively prevent wall cracking.

 

Twenty-three, cast-in-place large-area plane concrete vacuum water absorption construction process.
Process practicesSpread a suction pad on the concrete surface after pouring, vibrating and leveling, and start the vacuum equipment to suck out free water from the concrete.
AdvantagesConcrete vacuum water absorption is an advanced technology to speed up the construction progress. While improving the strength of concrete, it shortens the construction period and speeds up the construction progress.

 

Twenty-four, masonry masonry using raw slurry scraping method
The traditional wall sweeping process is omitted, and the method of jointing with the original slurry is adopted.

 

Twenty-five, concrete shear wall and column support mold reinforcement construction practice.
When the concrete shear wall and column formwork are set up, the formwork is reinforced by the pull bolt with PVC pipe and plastic plug head, which effectively prevents the slurry running and slurry leakage in the process of concrete pouring and vibrating, and can easily pull out the screw, thus improving the turnover utilization rate of the screw. At the same time, a bell mouth is formed at the plug head, which is more convenient for blocking the bolt hole.

 

Twenty-six, tie bar after planting construction practice
In the frame structure filling wall masonry, the filling wall and frame column junction of the tie bar, the promotion of the use of structural glue after the planting method construction practice, changed in the column embedded iron pieces, steel bars in the traditional practice, so as to ensure the location and elevation of the tie bar is accurate.

 

Application technology of plastering gypsum instead of cement mortar or mixed mortar in indoor plastering works
Construction practices: Plaster gypsum is divided into bottom layer plaster gypsum and surface layer plaster gypsum. The bottom layer plaster gypsum is used for backing and leveling of plastering wall surface. The thickness depends on the flatness and verticality of the base layer. It can cover the base layer, and the thinnest part is not less than 5mm. The operation method is the same as that of cement mortar plastering. Mechanical stirring, spraying, and then manual scraping and rubbing can also be used for leveling. The surface layer is plastered with gypsum for the covering surface on the leveling layer, and a thin layer of steel trowel is used to make the sand pit on the surface of the leveling layer fill and level, and the surface can be smooth, with a thickness of about 1~2mm.
AdvantagesThe plastering layer using water sand mortar or mixed mortar is prone to common quality defects such as hollowing and cracks during construction. At the same time, after delivery and use, the plastering layer is cracked due to shrinkage and deformation of cement. The plaster has good characteristics such as early strength, fast hardening, fire prevention, heat preservation and heat insulation, strong bonding force, automatic adjustment of indoor humidity, and fine and comfortable surface appearance and feel. Because of its micro-expansion and large bonding force, can effectively prevent plaster cracks, peeling and shedding, at the same time, the plaster base is not high, no need to brush any interface agent or cement slurry on the surface of the base can be directly plastered.

 

Twenty-eight, stair railings cold-drawn chrome plating new process.
Process practices:The new technology of cold drawing chrome plating for stair railing is adopted, and the steel bar with a diameter 4mm thicker than the original design steel bar is cold drawn to the diameter of the design steel bar and then chrome plated.
Advantages:Stair railings are made of round steel direct chrome plating, which often leads to rough surface, poor brightness and cleanliness, easy anti-rust and other shortcomings. After adopting this process, the smoothness, brightness and corrosion resistance of the railing can be greatly improved.

 

Twenty-nine, decoration engineering plastering surface layer of the male corner parts using inlaid L-shaped male corner strip construction practices
Construction practices: After the plastering leveling layer construction is completed according to the design requirements, the L-shaped male angle strip is pasted on the male angle part, and the quality of pasting is controlled and checked by hanging line. The full length of the male angle strip is required to be pasted fully, and intermittent pasting is allowed. The surface layer is plastered with male angle instead of gray rib, and is leveled with the sharp corner small surface of the male angle strip. If plaster plaster material is used, the L-shaped positive angle line can be directly pasted to the positive angle part, and then the surface can be plastered.
Yang corner bar classification:
1, used for walls, columns, beams and doors and windows and other plastering wall plastic male angle strip;
2, used for tile wall surface of the male corner strip.
Advantages: 1. After the corner line is inlaid with the corner line, the corner line is straight, obvious, beautiful and has excellent overall effect.
2, in the construction operation, the positive angle line instead of gray reinforcement, more convenient for the operation of operators and ensure the control of plastering quality.
3. It can effectively protect the male corner.






 

Thirty, stair step stick wear-resistant copper bar practice
Stairs stepping yang angle stick wear-resistant copper bar, construction method is simple, beautiful and generous, durable.

 

Thirty-one, wooden door leaf paint scraping construction practices
Process practices:
(1) Clean up the base
(2) Scrape off the oil
(3) Scraping and batching putty
(4) Grind and smooth
(5) Painting
(6) Putty
(7) Grind flat and smooth
(8) Painting and scraping
(9) Fine grinding
(10) Brush paint, and then use a large plate to smooth and scrape according to the dry condition.
Advantages:The large plate paint scraping process is adopted to make the paint surface smooth, bright, consistent in color and thick in texture, and at the same time eliminate common quality problems such as brush lines and flow fall.











 

Thirty-two, full wire boom in the installation of the application of technology.
Material features:The full-wire hanger rod is the finished rod of grade I round steel, which is full-wire and galvanized in the factory. At the construction site, it can be intercepted according to the length of use, and then one end of the screw rod is installed with nuts, washers, expansion pipes and internal expansion bolts to form a self-expanding anchor end, thus playing the role of suspending the hanger rod.
Advantages: The process is easy to operate on site, fast installation speed, and good appearance after installation.

 

Thirty-three, hot galvanized pipe using groove connection technology.
Process practices: Hot-dip galvanized pipe promotes groove connection technology, which uses high-quality rubber sealing ring. The joint is made of high-strength corrosion-resistant ductile iron, and its service life exceeds that of the pipe itself. The flange of the groove joint is engaged with the circumferential ring of the pipe end groove, and then locked with high-strength bolts.
Advantages:The technology has the advantages of simple operation, fast installation speed, no need for secondary galvanizing rust removal, convenient maintenance in the later period, and 10% ~ 20% of the total construction cost compared with the traditional connection technology.

 

Thirty-four, drainage pipeline centrifugal cast iron pipe application technology.
The centrifugal cast iron pipe has dense organization, thin pipe wall and light weight. The interface is connected by stainless steel clamp and rubber ring, which is convenient for loading and unloading. Compared with socket cast iron pipe and PVC pipe, it has the characteristics of simple maintenance, anti-leakage, corrosion resistance, aging resistance, noise reduction and long service life.