The 2024 Weifang Vocational Skills Competition-"Hongyuan Cup" Waterproof Vocational Skills Competition Specific Competition Rules and Requirements
Release time:
2025-11-28 17:04
1Mould and practice of polymer waterproofing membrane
Perforated mechanical fixed construction and non-perforated mechanical fixed construction can be selected.
- Fixed construction with perforated machinery
① Preparation
Wear protective articles (work clothes, gloves, safety shoes, protective glasses, masks, etc.);
Sample cutting (subject to the size of the field model);
According to the same method of male angle, please cut the sample according to the model size.
② Operation
A:Yang corner
B:large face
a) T-shaped lap joint shall be cut;
b1) The male angle treatment is shown in the figure;
c3) The coiled material shall be turned up to the outer edge of the parapet.
③ Requirements
a1) Protective articles shall be fully worn;
b1) Accuracy of operation tools;
c1) Accurate cutting;
d3) The paving sequence is correct, and the paving quality meets the requirements;
e1) Self-inspection and repair of damage during paving;
f3) Appearance quality shall meet the requirements.
Non-perforated mechanical fixed construction
① Preparation
Wear protective articles (work clothes, gloves, safety shoes, protective glasses, masks, etc.);
Sample cutting (subject to the size of the field model);
Please cut the sample according to the model size.
② Operation
large face
a) T-shaped lap joint shall be cut;
b1) The treatment of the male angle is the same as above;
c2) No perforation construction steps and effects.
③ Requirements
With perforated mechanical fixed construction.
2Mould and practice of modified asphalt waterproofing membrane
(1) Preparation
Wear protective articles (work clothes, gloves, safety shoes, protective glasses, masks, etc.);
Cut and install the protective panel to the following dimensions;
Sample cutting (subject to the size of the field model);
Please cut your own sample according to the size of the competition model.
(2) Operation
① Preparation
Wear protective articles (safety shoes, work clothes, gloves, masks, etc.).
② Big face
a) The lap width of long side is 80-100mm, and that of short side is 100mm;
b2) The overlapping width of the parapet wall and the large surface is 150mm.
c) Treatment requirements for female and male angles, as shown in the figure;
d2) The roll material of the facade shall be turned up to 50mm along the top of the wall without applying sealing paste;
③ The paving sequence is: strengthening layer → large plane → flooding
a) The size of the reinforcement layer is 80mm * 150mm;
b) The overlap width of the floodwater facade is 80-100mm, and the welding width with the bottom surface is 150mm;
④ Yang corner
Strengthening treatment (D)→ coil trial laying and cutting → plane coil laying (A)→ shale surface treatment at overlapping parts → elevation coil laying (B)→ shale surface treatment at overlapping parts → elevation coil laying (C)
Requirements: the lap width of the plane shall not be less than 150mm, and the lap width of the facade shall not be less than 100mm.
⑤ Requirements
a1) Protective articles shall be fully worn;
b1) Accuracy of operation tools;
c3) The paving sequence is correct, and the paving quality meets the requirements;
d1) Self-inspection and repair of damage during paving;
e3) Appearance quality shall meet the requirements.