1Mould and practice of polymer waterproofing membrane

Perforated mechanical fixed construction and non-perforated mechanical fixed construction can be selected.

  • Fixed construction with perforated machinery

① Preparation

Wear protective articles (work clothes, gloves, safety shoes, protective glasses, masks, etc.);

Sample cutting (subject to the size of the field model);

According to the same method of male angle, please cut the sample according to the model size.

 

 

 

 

② Operation

A:Yang corner

B:large face

a) T-shaped lap joint shall be cut;

b1) The male angle treatment is shown in the figure;

c3) The coiled material shall be turned up to the outer edge of the parapet.

③ Requirements

a1) Protective articles shall be fully worn;

b1) Accuracy of operation tools;

c1) Accurate cutting;

d3) The paving sequence is correct, and the paving quality meets the requirements;

e1) Self-inspection and repair of damage during paving;

f3) Appearance quality shall meet the requirements.

Non-perforated mechanical fixed construction

① Preparation

Wear protective articles (work clothes, gloves, safety shoes, protective glasses, masks, etc.);

Sample cutting (subject to the size of the field model);

Please cut the sample according to the model size.

② Operation

large face

a) T-shaped lap joint shall be cut;

b1) The treatment of the male angle is the same as above;

c2) No perforation construction steps and effects.

③ Requirements

With perforated mechanical fixed construction.

2Mould and practice of modified asphalt waterproofing membrane

(1) Preparation

Wear protective articles (work clothes, gloves, safety shoes, protective glasses, masks, etc.);

Cut and install the protective panel to the following dimensions;

Sample cutting (subject to the size of the field model);

Please cut your own sample according to the size of the competition model.

(2) Operation

① Preparation

Wear protective articles (safety shoes, work clothes, gloves, masks, etc.).

② Big face

a) The lap width of long side is 80-100mm, and that of short side is 100mm;

b2) The overlapping width of the parapet wall and the large surface is 150mm.

c) Treatment requirements for female and male angles, as shown in the figure;

d2) The roll material of the facade shall be turned up to 50mm along the top of the wall without applying sealing paste;

③ The paving sequence is: strengthening layer → large plane → flooding

a) The size of the reinforcement layer is 80mm * 150mm;

b) The overlap width of the floodwater facade is 80-100mm, and the welding width with the bottom surface is 150mm;

④ Yang corner

Strengthening treatment (D)→ coil trial laying and cutting → plane coil laying (A)→ shale surface treatment at overlapping parts → elevation coil laying (B)→ shale surface treatment at overlapping parts → elevation coil laying (C)

Requirements: the lap width of the plane shall not be less than 150mm, and the lap width of the facade shall not be less than 100mm.

⑤ Requirements

a1) Protective articles shall be fully worn;

b1) Accuracy of operation tools;

c3) The paving sequence is correct, and the paving quality meets the requirements;

d1) Self-inspection and repair of damage during paving;

e3) Appearance quality shall meet the requirements.

 

 

 

 

 